A. If the plastic is highly sensitive or corrosive to heat, PP should be used to remove the material that resides during each shutdown.
B. Remove all moisture, mist, oil and other debris to prevent mold rust.
C. If the mold is stored for too long, moisture may erode the heater and must be dehumidified before use.
D. If the needle valve system is used, it needs to be maintained 1-2 times per season to prevent carbonization corrosion or the movement of the air is not smooth.
E-1. The hot runner system is in trouble during the production process. How to communicate with the supplier?
Two principles:
A. Who finds the problem and who is responsible for communication
B. Make it clear, under what circumstances what kind of failure occurred
car coolant plastic water tank mouldinjection mouldautomotive part mould1+1 cavity718 mould steelcold runner
Tuofang company is specialized in designing and manufacturing Plastic Injection.
No. 345 Xinjiang Road, Xinqian Street of Huangyan, Taizhou City, 318020, Zhejiang Province, China