Place of Origin:Zhejiang, China (Mainland)
Model Number:Customized
Shaping Mode:Plastic Injection Mould
Product Material:Steel
Quantity: | |
---|---|
Quick Details |
Place of Origin | Zhejiang, China (Mainland) |
Model Number | Customized |
Shaping Mode | Plastic Injection Mould |
Product Material | Steel |
Product Name | Automotive brake oil tank mould |
Mould material | P20 |
Mould life | 300000-500000shots |
Mould base | C45 |
Design software | UG |
Cavity | 1+1 |
Surface treatment | Polishing |
Runner | Hot Runner |
Supply Ability | 30 Set/Sets per Quarter |
Packaging Details | Wooden case |
Port | Ningbo |
Lead Time | 70days |
The main Mold Steel and Hardness for you reference: |
Steel Grade | S50C | P20 | P20H | 718H | 2738H | 2316 | H13 | S136 | NAK80 |
Hardness(HRC) | 17-22 | 27-30 | 33-37 | 32-36 | 34-38 | 46-52 | 45-52 | 48-52 | 34-40 |
Main processing: |
CNC, wire cutting, Grinding machine, Lathe, Drill Press, EDM center
Manufacturing flow of mould: |
1 | RFQ | Get the sample or drawing from customer, analyze and quote as per customer requests, give some professional suggestions to help customer improve the product |
2 | Negotiation | Discuss about the mould steel, delivery time, payment term and so on |
3 | Place an order | Customer confirms the plastic material, injection machine spec and other details, we start make the design |
4 | Mould design | Make the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests. |
5 | Mould tooling | Start the mould tooling after mould design confirmed.(Cut steel, CNC machining, polishing, testing.) |
6 | Mould processing | Mould process photo or video update to customer each 10 days |
7 | Test sample | T1: checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve |
8 | Delivery | Once sample approved, will ship the moulds within 7 days after get customer ship |
9 | Shipping | By Sea- Nearest port: Ningbo or Shanghai, By Air- Nearest port: Shanghai or Hangzhou |
Mould show |
Mould maintenance |
a)When the mould is vacant, spray the anti-rust oil
b)To clean the gate and cooling system regularly
c)Avoid to use recycled material if the mould is suitable for virgin material only
Shipping Prepare |
We will prepare the some wear parts, like spring, ejector pins, cooling conector, eyeblot.pack with the mould.
Our advantages |
Pre-sale service:
The good sale person for professional and promptly communication
In-sale service:
Our designer teams will support customer R&D,make the product and mould design as per customer request, do the modification and give the professional suggestion for improve the product. Update the mould process to customer
After-sale service:
Suggest the mould maintance, If the mould have quality problem during our guarantee period, will freely supply the wear part for replace the broken piece and technique support; also if you have any issue in using our moulds, we provide the professional suggestions and helps
About us |
Our company has set its strategic objective which is “high standard, high precision, high efficiency” by taking quality as life. Based on the working-style of “Honesty and Practicality, Persevering Unremittingly, Teamwork Spirit, Achieving Greatness”, our company would like to sincerely invite the global prospective customers to pay a visit and have a good cooperation for a splendid future together.
FAQ |
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: What type mould you can make?
A: We can make all kinds of plastic injection mould.
Q. When can I get the price?
A: We usually quote within 48 hours after we get your inquiry. For the urgent inquiry please let us know, we will quote to you within 24 houus
Q. I have no 3D drawing, how should I start the new project?
A: We very welcome you give us the samples, we will help you finish the 3D drawing design.
Q. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A: Yes. DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models
Q: How long is your delivery time?
A: Generally it is 40-60 days for 1st sample. or it is 60-90 days for big moulds
Q: What is your terms of payment ?
A: 50% T/T in advance ,balance before shippment.
How can we contact you ? |
Tom Yang Director | Phoebe Peng Sales Director | Emma Zhang Foreign Trade Manager |
Mobile: 86 13566821689 Mail: tom@chinatuofang.com | 861375766962 | 86 15215817209 |
Hot Tags: automotive brake oil tank mould, China, suppliers, factory, customized, quotation, made in China, Car Cooling Plastic Coolant Reservoir Mould, automotive engine injection water tank mould, plastic reservoir tank injection mould, car oil thank mould, Car Injection Engine Coolant Tank Mould, Car Cooling System Coolant Tank Mould
Quick Details |
Place of Origin | Zhejiang, China (Mainland) |
Model Number | Customized |
Shaping Mode | Plastic Injection Mould |
Product Material | Steel |
Product Name | Automotive brake oil tank mould |
Mould material | P20 |
Mould life | 300000-500000shots |
Mould base | C45 |
Design software | UG |
Cavity | 1+1 |
Surface treatment | Polishing |
Runner | Hot Runner |
Supply Ability | 30 Set/Sets per Quarter |
Packaging Details | Wooden case |
Port | Ningbo |
Lead Time | 70days |
The main Mold Steel and Hardness for you reference: |
Steel Grade | S50C | P20 | P20H | 718H | 2738H | 2316 | H13 | S136 | NAK80 |
Hardness(HRC) | 17-22 | 27-30 | 33-37 | 32-36 | 34-38 | 46-52 | 45-52 | 48-52 | 34-40 |
Main processing: |
CNC, wire cutting, Grinding machine, Lathe, Drill Press, EDM center
Manufacturing flow of mould: |
1 | RFQ | Get the sample or drawing from customer, analyze and quote as per customer requests, give some professional suggestions to help customer improve the product |
2 | Negotiation | Discuss about the mould steel, delivery time, payment term and so on |
3 | Place an order | Customer confirms the plastic material, injection machine spec and other details, we start make the design |
4 | Mould design | Make the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests. |
5 | Mould tooling | Start the mould tooling after mould design confirmed.(Cut steel, CNC machining, polishing, testing.) |
6 | Mould processing | Mould process photo or video update to customer each 10 days |
7 | Test sample | T1: checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve |
8 | Delivery | Once sample approved, will ship the moulds within 7 days after get customer ship |
9 | Shipping | By Sea- Nearest port: Ningbo or Shanghai, By Air- Nearest port: Shanghai or Hangzhou |
Mould show |
Mould maintenance |
a)When the mould is vacant, spray the anti-rust oil
b)To clean the gate and cooling system regularly
c)Avoid to use recycled material if the mould is suitable for virgin material only
Shipping Prepare |
We will prepare the some wear parts, like spring, ejector pins, cooling conector, eyeblot.pack with the mould.
Our advantages |
Pre-sale service:
The good sale person for professional and promptly communication
In-sale service:
Our designer teams will support customer R&D,make the product and mould design as per customer request, do the modification and give the professional suggestion for improve the product. Update the mould process to customer
After-sale service:
Suggest the mould maintance, If the mould have quality problem during our guarantee period, will freely supply the wear part for replace the broken piece and technique support; also if you have any issue in using our moulds, we provide the professional suggestions and helps
About us |
Our company has set its strategic objective which is “high standard, high precision, high efficiency” by taking quality as life. Based on the working-style of “Honesty and Practicality, Persevering Unremittingly, Teamwork Spirit, Achieving Greatness”, our company would like to sincerely invite the global prospective customers to pay a visit and have a good cooperation for a splendid future together.
FAQ |
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: What type mould you can make?
A: We can make all kinds of plastic injection mould.
Q. When can I get the price?
A: We usually quote within 48 hours after we get your inquiry. For the urgent inquiry please let us know, we will quote to you within 24 houus
Q. I have no 3D drawing, how should I start the new project?
A: We very welcome you give us the samples, we will help you finish the 3D drawing design.
Q. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A: Yes. DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models
Q: How long is your delivery time?
A: Generally it is 40-60 days for 1st sample. or it is 60-90 days for big moulds
Q: What is your terms of payment ?
A: 50% T/T in advance ,balance before shippment.
How can we contact you ? |
Tom Yang Director | Phoebe Peng Sales Director | Emma Zhang Foreign Trade Manager |
Mobile: 86 13566821689 Mail: tom@chinatuofang.com | 861375766962 | 86 15215817209 |
Hot Tags: automotive brake oil tank mould, China, suppliers, factory, customized, quotation, made in China, Car Cooling Plastic Coolant Reservoir Mould, automotive engine injection water tank mould, plastic reservoir tank injection mould, car oil thank mould, Car Injection Engine Coolant Tank Mould, Car Cooling System Coolant Tank Mould
Tuofang company is specialized in designing and manufacturing Plastic Injection.
No. 345 Xinjiang Road, Xinqian Street of Huangyan, Taizhou City, 318020, Zhejiang Province, China