Our company manufacturing high quality plastic injection mold like car radiator tank, mask grille, engine coolant tank, fan and fan shroud, car interior part, car rear view mirror.
Quantity: | |
---|---|
Quick Details |
Place of Origin | Zhejiang, China (Mainland) |
Model Number | Customized |
Shaping Mode | Plastic Injection Mould |
Product Material | Steel |
Product Name | Car intercooler plastic tank mould |
Mould material | P20 |
Mould life | 300000-500000shots |
Mould base | C45 |
Design software | UG |
Cavity | 1 |
Surface treatment | Polishing |
Runner | Cold Runner |
Supply Ability | 30 Set/Sets per Quarter |
Packaging Details | Wooden case |
Port | Ningbo |
Lead Time | 50days |
Manufacturing flow of mould: |
1 | RFQ | Get the sample or drawing from customer, analyze and quote as per customer requests, give some professional suggestions to help customer improve the product |
2 | Negotiation | Discuss about the mould steel, delivery time, payment term and so on |
3 | Place an order | Customer confirms the plastic material, injection machine spec and other details, we start make the design |
4 | Mould design | Make the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests. |
5 | Mould tooling | Start the mould tooling after mould design confirmed.(Cut steel, CNC machining, polishing, testing.) |
6 | Mould processing | Mould process photo or video update to customer each 10 days |
7 | Test sample | T1: checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve |
8 | Delivery | Once sample approved, will ship the moulds within 7 days after get customer ship |
9 | Shipping | By Sea- Nearest port: Ningbo or Shanghai, By Air- Nearest port: Shanghai or Hangzhou |
Mould Show |
Shipping Prepare |
1.Check mould component
2.Cleaning mould cavity/core and spread slushing oil on the mould
3.Cleaning mould surface and spread slushing oil on the mould surface
4.Put into the wooden case
5.Transport by container
Mould maintenance |
a)When the mould is vacant, spray the anti-rust oil
b)To clean the gate and cooling system regularly
c)Avoid to use recycled material if the mould is suitable for virgin material only
Our Service |
1.Provide OEM/ODM service
2.Provide professional plastic mould design and manufacturing serivce
3.Provide plastic parts moulding/ printing/ painting service
4.Provide plastic parts assembly service
5.Provide plastic parts package service
6.Provide After-Sales service
FAQ |
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: What type mould you can make?
A: We can make all kinds of plastic injection mould.
Q: Where is your factory located?
A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 20 minutes from train station to our factory.
Q: How to go to your factory?
A: You can come to us by flight, bus and bullet train. It’s 1.5 hours by flight from Guangzhou to our city. 3 hours by bullet train from Shanghai to our city. 1 hour by bullet train from Ningbo to us.
Q. When can I get the price?
A: We usually quote within 48 hours after we get your inquiry. For the urgent inquiry please let us know, we will quote to you within 24 houus
Q. I have no 3D drawing, how should I start the new project?
A: We very welcome you give us the samples, we will help you finish the 3D drawing design.
Q. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A: Yes. DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models
Q. How long is the lead-time for mold?
A: It all depends on the mold’s size and complexity. Normally, the lead time is 30-60days.
How can we contact you ? |
Tom Yang Director | Phoebe Peng Sales Director | Emma Zhang Foreign Trade Manager |
Mobile: 86 13566821689 Mail: tom@chinatuofang.com | 861375766962 | 86 15215817209 |
Hot Tags: car intercooler plastic tank mould, China, suppliers, factory, customized, quotation, made in China, Automotive Intercooler End Tank Mould, Car Intercooler Plastic Tank Mould, Car Intercooler End Tank Mould, Car Intercooer Plastic End Tank Mould
Quick Details |
Place of Origin | Zhejiang, China (Mainland) |
Model Number | Customized |
Shaping Mode | Plastic Injection Mould |
Product Material | Steel |
Product Name | Car intercooler plastic tank mould |
Mould material | P20 |
Mould life | 300000-500000shots |
Mould base | C45 |
Design software | UG |
Cavity | 1 |
Surface treatment | Polishing |
Runner | Cold Runner |
Supply Ability | 30 Set/Sets per Quarter |
Packaging Details | Wooden case |
Port | Ningbo |
Lead Time | 50days |
Manufacturing flow of mould: |
1 | RFQ | Get the sample or drawing from customer, analyze and quote as per customer requests, give some professional suggestions to help customer improve the product |
2 | Negotiation | Discuss about the mould steel, delivery time, payment term and so on |
3 | Place an order | Customer confirms the plastic material, injection machine spec and other details, we start make the design |
4 | Mould design | Make the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests. |
5 | Mould tooling | Start the mould tooling after mould design confirmed.(Cut steel, CNC machining, polishing, testing.) |
6 | Mould processing | Mould process photo or video update to customer each 10 days |
7 | Test sample | T1: checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve |
8 | Delivery | Once sample approved, will ship the moulds within 7 days after get customer ship |
9 | Shipping | By Sea- Nearest port: Ningbo or Shanghai, By Air- Nearest port: Shanghai or Hangzhou |
Mould Show |
Shipping Prepare |
1.Check mould component
2.Cleaning mould cavity/core and spread slushing oil on the mould
3.Cleaning mould surface and spread slushing oil on the mould surface
4.Put into the wooden case
5.Transport by container
Mould maintenance |
a)When the mould is vacant, spray the anti-rust oil
b)To clean the gate and cooling system regularly
c)Avoid to use recycled material if the mould is suitable for virgin material only
Our Service |
1.Provide OEM/ODM service
2.Provide professional plastic mould design and manufacturing serivce
3.Provide plastic parts moulding/ printing/ painting service
4.Provide plastic parts assembly service
5.Provide plastic parts package service
6.Provide After-Sales service
FAQ |
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: What type mould you can make?
A: We can make all kinds of plastic injection mould.
Q: Where is your factory located?
A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 20 minutes from train station to our factory.
Q: How to go to your factory?
A: You can come to us by flight, bus and bullet train. It’s 1.5 hours by flight from Guangzhou to our city. 3 hours by bullet train from Shanghai to our city. 1 hour by bullet train from Ningbo to us.
Q. When can I get the price?
A: We usually quote within 48 hours after we get your inquiry. For the urgent inquiry please let us know, we will quote to you within 24 houus
Q. I have no 3D drawing, how should I start the new project?
A: We very welcome you give us the samples, we will help you finish the 3D drawing design.
Q. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A: Yes. DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models
Q. How long is the lead-time for mold?
A: It all depends on the mold’s size and complexity. Normally, the lead time is 30-60days.
How can we contact you ? |
Tom Yang Director | Phoebe Peng Sales Director | Emma Zhang Foreign Trade Manager |
Mobile: 86 13566821689 Mail: tom@chinatuofang.com | 861375766962 | 86 15215817209 |
Hot Tags: car intercooler plastic tank mould, China, suppliers, factory, customized, quotation, made in China, Automotive Intercooler End Tank Mould, Car Intercooler Plastic Tank Mould, Car Intercooler End Tank Mould, Car Intercooer Plastic End Tank Mould
Tuofang company is specialized in designing and manufacturing Plastic Injection.
No. 345 Xinjiang Road, Xinqian Street of Huangyan, Taizhou City, 318020, Zhejiang Province, China